What Is The Maintenance Schedule For Cored Wire Equipment?

Sep 04, 2026

Leave a message

Daily Maintenance (Pre- and Post-Shift)
Frequency: Once per shift; minimum duration of 20 minutes per session.
Tasks: Check the overall condition of the machine and apply basic lubrication before startup; clean up residual powder and wipe down equipment surfaces after shutdown; complete the daily operation log.

 

Weekly Routine Maintenance
Frequency: Once per week; duration of 1–3 hours per session.
Tasks: Thoroughly clean hard-to-reach areas; check drive belt tension; apply grease to all exposed drive components; inspect for abnormal noises or vibrations.

 

Monthly Level-1 Maintenance
Frequency: Once per month (can be adjusted to once every 20 days for continuous operation in high-dust environments).
Tasks: Dismantle and clean designated protective covers; clear all lubrication lines; tighten any loose bolts; adjust the clearance settings for the cored wire forming rollers.