Maintenance of the Copper-Aluminum Tube Welding Production Line

Aug 14, 2026

Leave a message

Daily Post-Shift Maintenance (Performed every shift)
‌Machine Cleaning: Use dry compressed air to remove copper-aluminum spatter and metal debris from the equipment surface and welding torch nozzle; direct washing of electrical components with water is strictly prohibited.
‌Basic Checks: Verify there are no leaks in the gas lines and that the cooling system water level is normal; inspect cable insulation for damage and ensure the grounding wire is securely connected.
‌Workstation Wrap-up: Clear welding slag and waste from the work surface; shut off gas, water, and main power supplies; and log any equipment operational anomalies observed during the day.

 

Weekly In-Depth Maintenance
‌Cooling System Cleaning: Remove heat dissipation filters from the welding power source and electrical control cabinet; clean off accumulated dust to ensure smooth airflow and prevent core components from overheating.
‌Wire Feed Mechanism Calibration: Inspect wire feed wheel grooves for wear; clean copper-aluminum metal powder from the wire feed conduit and use compressed air to back-purge and clear any blockages.
‌Motion Accuracy Verification: Run production line stations under no-load conditions; confirm smooth operation (without sticking) of transmission rails and conveyor rollers; and test the safety interlock function of the emergency stop button.

Send Inquiry
Contact usif have any question

You can either contact us via phone, email or online form below. Our specialist will contact you back shortly.

Contact now!