Production Process for Copper-Aluminum Tube Welding Lines

Aug 11, 2026

Leave a message

Pre-welding Preparation
This step is crucial for ensuring effective filler metal wetting and directly determines joint quality:

‌Joint Preparation‌: The copper tube is machined into a socket configuration to receive the aluminum tube; the radial clearance is strictly controlled between 0.05 and 0.2 mm, and the joint overlap length does not exceed 30 mm (butt joints are avoided).
‌Copper Surface Activation‌: Sanding with 120-grit abrasive paper removes the oxide layer, ensuring a surface roughness of Ra ≤ 1.6 μm; this is followed by a 2-minute immersion in a 5% sulfuric acid solution to form a CuSO₄ transition layer.
‌Aluminum Surface Roughening‌: Degreasing via alkaline washing in a 10% NaOH solution at 60°C for 3 minutes, followed by acid pickling in a mixture of 20% HNO₃ and 5% HF for 1 minute to break down the high-melting-point Al₂O₃ oxide film and create a microscopically rough surface.

 

Filler Metal Placement and Fixture Positioning
A "sandwich" composite filler structure is employed to inhibit the formation of brittle phases:

An Al-Si-Cu-Ni series filler metal (such as 4047 Al-Si alloy) is used in conjunction with a 0.1 mm thick copper foil interlayer, with the melting point controlled between 560°C and 580°C.
The filler metal ring or strip is positioned in the welding zone with a gap of ≤0.05 mm against the tube's outer wall; the inner diameter of the filler ring is 0.3 mm larger than the tube's outer diameter to ensure uniform heating and melting.

Send Inquiry
Contact usif have any question

You can either contact us via phone, email or online form below. Our specialist will contact you back shortly.

Contact now!