Installation Preparation Essentials
Site and Positioning:Select a level, stable, and well-ventilated location, avoiding areas prone to dampness or the accumulation of highly corrosive gases. Determine the installation position based on design drawings, ensuring sufficient space for smooth airflow and avoiding airflow short-circuits or stagnant zones.
Piping and Sealing: Lay piping strictly according to the design; reinforce connections with high-temperature resistant gaskets to ensure a tight, leak-free seal. Properly set pipe gradients to prevent water accumulation or airlocks.
Support and Vibration Prevention: Install sturdy supports for large equipment to bear the full weight. Incorporate thermal expansion compensation structures at pipe connections to prevent fatigue damage or joint leaks caused by vibration.
Pre-operation Checks: Confirm that the finned tube material is fully compatible with the process fluid. Verify that safety accessories-such as safety valves, pressure gauges, and thermometers-are within their valid service periods. Conduct a leak test at 1.5 times the working pressure; the test is considered successful if the pressure remains stable without dropping over a 30-minute hold period.
Standardized Startup Procedures
Slowly open the inlet and outlet valves for the low-temperature fluid (e.g., water, air) and open the vent valve to purge air from the system; confirm that the cold fluid has been circulating for 15 minutes with stable pressure.
Gradually introduce the high-temperature fluid (e.g., steam, hot water), slowly increasing temperature and pressure to avoid thermal shock, which could cause tube loosening or tubesheet deformation.
Maintain the rate of pressure change at or below 0.5 MPa/min throughout the process; strictly prohibit rapid valve operation to prevent water hammer or gas hammer phenomena.